Build
Production lane
Planning & Survey
POP & HOTO tracking · RKM progress · GIS-ready field data
Construction + MSheet
Execution milestones · MSheet evidence · RA billing
Analytics + GIS
Live dashboards · BSNL-ready reports
Built natively for BharatNet Phase 3 — not adapted from a generic construction ERP.
Open platform dashboardBuild
Production lane
Planning & Survey
POP & HOTO tracking · RKM progress · GIS-ready field data
Construction + MSheet
Execution milestones · MSheet evidence · RA billing
Analytics + GIS
Live dashboards · BSNL-ready reports
Operate
Production lane
ITS / Ticketing / SNOC
NMS alarm intake · Auto-assign · SLA-backed closure
FRT + Patrol
Offline mobile app · GPS-tracked activity
SLA & MTTR
Real-time breach view · MTTR lens · Escalation
Control
Production lane
WFMS + HRMS
Shifts · Attendance · GPS fence
Labour Compliance
Form XIX · XII · VIII · PF · ESI
Finance + Petty Cash
Wallet · QR · Auto-reconcile
Govern
Production lane
Warehouse + Assets
Material · Consumption · Stock
Vehicle Management
Odometer · Trips · Fuel · Service
Vendor Management
RBAC · KPI · Performance scorecard
Package
P4
Package
P7
Package
P13
5 States Active
Packages, states, business areas, districts, blocks, GPs, spans, and rings are already structured inside the platform.
19
Business Areas
170
Districts
1,913
Blocks
16,000+
Gram Panchayats
4,000+
Spans
600+
Rings
of BharatNet Phase 3 fiber construction — tracked, documented & submitted to BSNL / IE.
Karnataka · P4
1,798 km done
J&K · P13
1,107 km · 89%
Bihar · P7
1,469 km done
NOT A DEMO
Production · Live Today
Start here when you want the room to see package progress, block progress, execution volume, and current bottlenecks.
Real production aggregates
Read-only5,612.36 km
Completed
Calculated execution distance
16,405.87 km
Planned scope
Span scope in system
200
Active blocks
Blocks with execution
44,747
Execution jobs
Field work records
Package and block progress
Show the current construction position without exporting spreadsheets.
Daily movement
Move from static claims to live completion and pending work.
Production proof
Dashboard values connect back to execution jobs and field evidence.
Use the live map when the audience needs to see where work actually happened, not only how much was reported.
Real production aggregates
Read-only35,462
Mapped jobs
Jobs with GPS coordinates
10,72,222
Mapped images
Evidence with GPS coordinates
200
Active blocks
Blocks with execution
05 Jun 2026 · 08:35 PM
Latest update
Newest job timestamp
Geographic proof
Show spans, routes, GPS traces, and current field geography.
Navigation-ready context
Jump from high-level discussion into actual map evidence.
Fast validation
Useful for district, block, and route-level construction review.
Use analytics when BSNL, IE, or management asks where execution is moving, slowing, or already complete.
Real production aggregates · Read-only
102.71 km
Last 7 days
Recent execution distance
3.59 m
Avg depth
Recorded trench depth
536
Machines
Machine master count
5,612.36 km
Completed
Calculated execution distance
Trend visibility
Move from raw records to patterns across construction activity.
Machine and method insight
Support execution review with operational analytics instead of anecdotes.
Reporting-ready view
Use live dashboards to support BSNL review conversations.
Use the jobs list when you need to drill from pitch numbers into the actual work records behind them.
Real production aggregates
Read-only44,747
Execution jobs
Field work records
11,62,455
Evidence items
Photos and videos captured
5,612.36 km
Completed
Calculated execution distance
05 Jun 2026 · 08:35 PM
Latest update
Newest job timestamp
Job-level traceability
Open work groups and inspect the exact execution records.
Evidence and submission flow
Move from dashboard total to photos, videos, and MSheet-ready details.
Operational search
Find the block, GP, route, or work item while presenting live.
Live O&M data · Active BharatNet package · Karnataka district · Operational from 7 May 2026
251
BSNL SLA Breached
Open penalty exposure
246
Unassigned Critical
No FRT team dispatched
319 hrs
Avg Open Age
Average incident ticket age
0%
SLA Compliance
Before platform deployed
The Platform Difference
"Without our platform — you see this when BSNL sends the penalty letter. With it — you see it today and act."
Use this when the audience wants to see operational control: dashboard, ticket flow, and zone-level health.
Real O&M aggregates
Read-only2,144
Open tickets
Current O&M workload
27,721
Total tickets
Incident and manual tickets
25,577
Closed tickets
Completed operations records
440
Active zones
Configured operating zones
O&M dashboard
Start with live operational posture and drill into the real issue list.
Ticket trends
Show whether the network is improving or drifting into penalty exposure.
Zone performance
Compare districts and operating zones without preparing a separate report.
Use this sequence for leadership: breached SLA, repair time, and actual root cause patterns in one live demo.
Real O&M aggregates · Read-only
2,144
SLA breached
Open exposure right now
2,101
Critical unassigned
High-priority without team
24.0%
SLA compliance
Closed tickets within SLA
207
RCA reports
Root-cause evidence captured
SLA exposure
Move from after-the-fact penalty letters to live breach visibility.
MTTR accountability
Show repair performance across teams, geography, and time.
RCA evidence
Identify repeat causes and prove where intervention is needed.
Use this when finance and operations are both in the room: who worked, what was consumed, and where performance is slipping.
Real O&M aggregates
Read-only693
Active teams
FRT and patrol teams
42
Assigned open
Open tickets with teams
15
Material logs
Consumption entries captured
15
Material quantity
Total consumed quantity
Team performance
Review FRT and patrol execution with measurable field output.
Material consumption
Connect ticket closure to real material usage and inventory pressure.
Commercial control
Bring operations and finance into the same evidence trail.
Six things no other platform in the BharatNet ecosystem has today.
Verify field evidence01
LOSI_DGI, BIN categories, GP/BHQ structure, SNOC/NMS integration — built in from day one. Not configured. Not bolt-on. Native.
02
Depth & Offset, HDD Report, OFC Blowing, Aerial Validation — auto-generated. BSNL format. RA billing done in Karnataka. Not in review — done.
03
Form XIX · Form XII · Form VIII · PF ECR · ESI — auto-generated from attendance and payroll. Zero consultant fees. Zero notices.
04
EXIF metadata preserved server-side. GPS burned into pixels permanently. Timestamp overlay. Duplicate photo detection. No fraudulent billing.
05
Flutter + Hive. Works in J&K mountains and Karnataka villages with zero connectivity. Syncs when signal returns. 4,493 GPs worth of data captured.
06
Every site expense linked to a GP, ticket, work order. Approval workflow. Spend limits. Auto-reconciles into Finance module. Every paisa tracked.
Latest tech, no fixed hours, tools that improve without a requirement — that's the baseline, not the exception.
We don't wait to be asked. When a better framework, library, or approach becomes stable — we ship it. The stack you see today is current, not inherited.
Deadlines don't follow office hours. Neither do we. If a fix is needed at 2 AM before a review meeting, it gets done at 2 AM. No follow-ups. No delays.
We see a slow query, a rough UX, an outdated integration — we fix it. No ticket required. No waiting for the next sprint. Good enough is never enough.
Monthly Loss Categories
RA billing delayed 4–6 weeks
₹20–50L/month
BSNL SLA penalty exposure
₹10–30L/month
Manual MSheet compilation
₹3–5L/month
Labour compliance consultants
₹18–24L/month
Attendance fraud + payroll errors
₹3–10L/month
Material pilferage untracked
₹5–15L/month
Total monthly loss
₹59–134L
/ month
Estimated range for 3,000 GP package
Platform investment
Implementation: ₹15L one-time · 90-day onboarding
Platform: ₹8–15L/month · All modules · All users
< 0.02% of package value
A finance head needs proof that work, material, attendance, vehicles and SLA exposure reconcile in one place.
Why this matters
Every percentage is a control point: billing readiness, penalty risk, dispatch discipline, stock movement, payroll hygiene and vehicle accountability.
34.2%
Billable progress
Completed construction against planned span scope
93.0%
Evidence-backed jobs
Execution jobs with field photo/video trail
100.0%
Penalty exposure rate
Open O&M tickets already past SLA
2.0%
Dispatch discipline
Open tickets already assigned to a team
100.0%
Material traceability
Consumption logs linked back to tickets
100.0%
Stock movement coverage
Warehouse stock rows with movement history
70.9%
Attendance closure
Attendance records with checkout captured
100.0%
Vehicle accountability
Active vehicles assigned to users
Material, stock, attendance, odometer and MSheet evidence are already tied to production records.
Read-only real sums
Live data15
Material logs
Ticket-linked consumption
8,489
Stock on hand
Warehouse quantity tracked
₹2,620
Ledger value
Stock movement amount
5,010
Attendance records
Payroll control evidence
8,53,01,988 km
Odometer km
Vehicle usage captured
2,08,706
MSheet rows
Billing evidence rows
The strongest boardroom flow: construction proof → O&M penalty control → commercial controls → people governance.
2,86,209
Controlled records
16
Live pages
27,721
O&M tickets
Construction & billing proof
Penalty & O&M control
Commercial controls
People & field governance
One platform. Already running. O&M live from 7 May 2026.
Contact
Mysuru District · Karnataka 01 MAY 2026
This presentation was built while the platform went live.